Case study

London, UK --:-- · …
All case studies

Construction compliance · B2B SaaS

Designing Performance Management Across Multiple Roles

How I helped turn a loosely defined performance-management idea into a connected workflow for creating assessments, involving project teams and reviewing supplier performance.

Enterprise SaaS 0→1 Multi-role workflow

Role

Senior Product Designer

Company

Once For All

Platform

Desktop web

Team

Product · Design · Engineering

Choose your view The complete case study.

Supply Chain Manager — Performance Management

Once For All Jane McDonald JM

Performance Management

Send survey
Org unit Constructionline
Overview Projects Suppliers Trades Tasks Surveys Templates Reports
Completion rate
83% 30 of 36 surveys completed
Total completed
30 All time, across all projects
Outstanding
6 Awaiting supplier response
Surveys completed by day Last 14 days
2Jul
30
2Jul
31
1Aug
01
1Aug
02
1Aug
03
1Aug
04
1Aug
05
1Aug
06
1Aug
07
1Aug
08
1Aug
09
1Aug
10
1Aug
11
1Aug
12
Responses by PM Laura Bennett9 Jamie Osei8 Chris Fielding7 Nadia Farooq6 Owen Pryce6
Last sent tasks

5 most recently sent

TaskAssigned toProject/SupplierDue dateStatus
Collect 360° feedback — CardiffChris Fielding Cardiff Central InterchangeAquaFlow Mechanical 06/08/2026Completed View
Track Pennine quality improvementJamie Osei Edinburgh Waterfront Res.Pennine Roofing & Cladding 08/09/2026In progress View
Submit updated method statementOwen Pryce Birmingham SmithfieldCityVolt Electrical 01/09/2026Not started View

Project Manager — the surveys assigned to them

Surveys

Create and track supplier performance surveys.

FilterSort My Surveys (9) Supplier Surveys (25)
ProjectSupplierFormSentStatus
Riverside Quarter Phase 2Hargreaves Groundworks Ltd Site Performance & Safety03/08/2026 Outstanding Answer
Manchester Victoria DepotPennine Roofing & Cladding Sustainability Practices13/07/2026 Completed View
St Thomas Hospital Wing BAquaFlow Mechanical Quality of Workmanship16/07/2026 Completed View

Project Manager — answering one of them

Once For All

Answer survey

Answers can't be edited once submitted

SupplierHargreaves Groundworks Ltd ProjectRiverside Quarter Phase 2
1. Did the supplier comply with all site health & safety requirements? Always Mostly Occasionally Never 2. Were RAMS (Risk Assessment & Method Statements) submitted on time and followed? Always Mostly Occasionally Never 4. Was PPE worn correctly and consistently by all site operatives? 12345
Cancel Submit survey
One product, two responsibilities: the Supply Chain Manager's view of every assessment, and the focused task a Project Manager receives from it.Recreated for this case study from the Supply Chain Manager and Project Manager prototypes; the figures are the prototypes' own sample data.

Overview

Performance Management was being introduced into a platform already used by construction companies to manage their supply chains and compliance. The idea sounded straightforward: allow customers to assess how their suppliers were performing.

In practice, it touched several parts of the product and several different people. A Supply Chain Manager might set up an assessment, a Project Manager could contribute knowledge about a supplier, and the resulting information needed to come back in a form that could be understood and acted on.

The challenge wasn't simply designing a survey. It was defining how those responsibilities connected into one understandable workflow — and what each person needed to see and do at each stage.

  1. Set up

    Decide what is being assessed, and on which project.

    Supply Chain Manager
  2. Prepare

    Choose the suppliers and the people who need to take part.

    Supply Chain Manager
  3. Contribute

    Answer for the project and supplier you actually work with.

    Project Manager
  4. Send

    Turn preparation into an active request that leaves your workspace.

    Supply Chain Manager
  5. Review

    Read the responses back as supplier and project performance.

    Supply Chain Manager
The shape of the workflow. Only one stage changes hands — and that hand-off is what most of the design work had to make legible.

Starting with a product that was still being defined

When I joined the work, many of the individual requirements existed, but the end-to-end experience was still taking shape. Questions remained around who should create an assessment, who needed to contribute, when work was ready to be sent, and what happened once responses started coming back.

Rather than treating those as separate screen requirements, I started looking at Performance Management as a system. The questions became less about UI components and more about ownership:

  • Who starts the process?
  • Who contributes?
  • What belongs to each role?
  • When does responsibility move between people?
  • How does someone understand what needs to happen next?

That became the structure I used to evaluate the designs as the product evolved.

Role

Supply Chain Manager

Creates, configures and oversees. Decides what is assessed, who is involved and when it goes out.

Role

Project Manager

Contributes project-specific knowledge about a supplier they work with directly.

Object

Assessment

Collects structured performance input. Owned by one person, answered by another.

Object

Results

Returns the information to the buyer as supplier, project and trade performance.

The working model I kept returning to: two roles, two objects, and the question of what each role owns at which point.

Designing around roles, not screens

One of the early risks was creating one workflow and adapting it slightly for everyone. The people involved weren't doing the same job.

The Supply Chain Manager needed oversight — setting up assessments, choosing suppliers, managing progress and reviewing results. The Project Manager's value came from knowledge of individual projects and suppliers, not from managing Performance Management as a whole.

One workflow, but not one experience. Instead of trying to make both sides symmetrical, I designed each around the responsibility that person actually had.

Supply Chain Manager

Manage the process

  • Creates and configures assessments
  • Selects suppliers and projects
  • Sends surveys
  • Tracks progress
  • Reviews performance
Project Manager

Complete the task

  • Receives focused requests
  • Contributes project-specific knowledge
  • Completes assigned input
  • Does not manage the wider system

Supply Chain Manager — eight areas to manage

Performance Management

Send survey
Org unit Constructionline
Overview Projects Suppliers Trades Tasks Surveys Templates Reports
ProjectTypeSuppliersPMsDateStatus
Bristol Harbourside HomesFor PMs 0102/09/2026 Draft Continue
Riverside Quarter Phase 2For Suppliers 2003/08/2026 Sent View
Cardiff Central Interchange360° 1124/07/2026 Sent View

Project Manager — two, and only what is theirs

Performance Management

Surveys Tasks
ProjectSupplierFormSentStatus
Riverside Quarter Phase 2Hargreaves Groundworks Ltd Site Performance & Safety03/08/2026 Outstanding Answer
Manchester Victoria DepotPennine Roofing & Cladding Sustainability Practices13/07/2026 Completed View
St Thomas Hospital Wing BAquaFlow Mechanical Quality of Workmanship16/07/2026 Completed View
Same product, same left-hand navigation, different responsibility. The Supply Chain Manager gets eight areas and a Send survey action; the Project Manager gets two areas and a list of things to answer.Recreated for this case study from the two prototypes.

Turning the workflow into clear states

As the product became more defined, much of the interaction design came down to states and transitions. An assessment could exist before it was ready to send; once it had been sent, the important actions changed again.

The interface therefore needed to answer three simple questions: Where am I? What still needs to happen? What can I do next?

I used those states to decide which actions should be available, rather than exposing every possible action at once — which is why saving an assessment and sending it became deliberately separate decisions.

The assessment

Owned by the Supply Chain Manager

Draft Continue
Sent View

Each recipient

A Project Manager or supplier contact

Outstanding Answer
Completed View
Underneath each state is the one action the product offers there. Both statuses and actions are taken from the built screens; nothing is added to make the model look symmetrical.

Saved — still mine to finish

ProjectTypeDateStatus
Bristol Harbourside HomesFor PMs02/09/2026 Draft Continue

Sent — now someone else's task

ProjectTypeDateStatus
Bristol Harbourside HomesFor PMs02/09/2026 Sent View
The same row, one transition apart. The status changes, and so does the only action offered: Continue while it is still yours, View once it isn't.Recreated for this case study from the Supply Chain Manager prototype.

Sequencing the complexity

Creating an assessment required several decisions: what was being assessed, which suppliers were involved, who needed to contribute and what information to collect. One large form would have exposed all of that at once.

I structured setup as a guided process instead, separating the decisions into stages while keeping enough context for someone to know where they were.

The goal wasn't to pretend the workflow was simple. It was to reveal the complexity at the point it became relevant — which also drew clearer boundaries between required information, optional configuration and actions that could happen later.

Interactive

Setting up one assessment — choose a step to see what each stage asks for, and what it deliberately leaves until later.

First decision

Everything downstream depends on who the assessment is for, so it is asked first and on its own.

  • A survey for Project Managers needs a project and a person; it never asks for supplier contacts.
  • Choosing 360° means both, which is why the number of steps is not fixed until this answer exists.

What type of survey?

Choose who this survey is intended for

For Project ManagersRequest supplier performance feedback from project managers
For SuppliersGather performance feedback on your suppliers.
360°A full review covering both PMs and suppliers.
Step 1 of 4

Four of the setup steps. How many there are depends on the first answer: a Project Manager survey runs Project → PM → Template → Review, while a supplier survey adds supplier selection and a named contact.Recreated for this case study from the Supply Chain Manager prototype.

Giving Project Managers a focused task

The Project Manager experience became an important test of whether the role model actually worked.

They needed enough context to understand why their input was required, which supplier and project it related to, and what they had to complete — not another Performance Management dashboard.

So I treated their experience as a focused task rather than a reduced version of the Supply Chain Manager product. Anything to do with wider administration stayed on the Supply Chain Manager side; this side concentrated on the information only they could provide.

The whole of the Project Manager's job, on one screen

Once For All

Answer survey

Answers can't be edited once submitted

SupplierHargreaves Groundworks Ltd ProjectRiverside Quarter Phase 2
1. Did the supplier comply with all site health & safety requirements? Always Mostly Occasionally Never 2. Were RAMS (Risk Assessment & Method Statements) submitted on time and followed? Always Mostly Occasionally Never 4. Was PPE worn correctly and consistently by all site operatives? 12345 8. Additional comments on site conduct and safety Good site conduct overall; minor delays on RAMS submission.
Cancel Submit survey

Once answered — kept, but closed

Review survey

Submitted 02/09/2026 · read-only

SupplierHargreaves Groundworks Ltd ProjectRiverside Quarter Phase 2
1. Did the supplier comply with all site health & safety requirements? Always 2. Were RAMS submitted on time and followed? Always

Meanwhile, on the Supply Chain Manager side

Survey takers

Everyone this survey was sent to, and whether they've responded.

Sent toFormStatus
Laura BennettProject Manager Communication & Responsiveness Completed
Owen PryceProject Manager Communication & Responsiveness Outstanding
Two roles, two jobs: the Project Manager completes the task; the Supply Chain Manager manages the process and sees the same submission as progress.Recreated for this case study from the two prototypes.

Designing the actions around intent

Some of the smallest interaction decisions became important because they represented different commitments in the workflow.

Saving a draft and sending a survey couldn't behave like interchangeable primary actions. Saving meant “I'm still working on this.” Sending meant “This is ready to leave my workspace and become someone else's task.”

That distinction affected button hierarchy, states, validation and what happened next — a small UI decision carrying a bigger product principle: actions should communicate the consequence they create.

1 Leaving mid-setup

Close this survey?

Save your work as a draft, continue editing, or discard your changes.

Discard Continue Save

Three outcomes, ranked — Save leads.

2 Finishing setup

Back Send survey

On every earlier step this button reads Continue.

Renamed only on the final step, where the commitment changes.

3 Submitting an answer

Submit this survey?

Once submitted, you won't be able to edit your answers. Make sure everything is correct before continuing.

Go back Submit survey

The Project Manager's equivalent moment, naming the consequence.

The same principle at three points in the workflow.Recreated for this case study from the two prototypes.
  1. Save

    Nothing leaves my workspace. The assessment stays a Draft and I keep the only action on it.

  2. Continue

    A step is settled, not the assessment. Reversible by going Back.

  3. Send survey

    The assessment becomes Sent and appears as Outstanding work for someone else.

  4. Submit survey

    The strongest commitment in the workflow: answers become Completed and read-only.

Designing while the scope was moving

Performance Management wasn't designed from a finished specification. Requirements arrived as conversations with product and engineering progressed, and the boundary between the two experiences moved with them.

Instead of treating each new requirement as another screen to add, I returned to three questions: Who owns this? At what stage? What changes because of it? That surfaced gaps in the product definition before they became more UI.

The clearest example is the setup flow itself: it has no fixed length. Answering “who is this for?” is what decides whether there are four steps or five — a structural consequence of the role model rather than a screen someone specified.

Bringing it together

By the later stages of the project, the individual screens had become one connected model.

Seen individually, these are fairly ordinary product interactions. The harder design problem was making the movement between them feel like one process rather than a collection of features.

1 Create

What type of survey?

Choose who this survey is intended for

For Project ManagersRequest supplier performance feedback from project managers
For SuppliersGather performance feedback on your suppliers.

2 Prepare

Select a project manager

Choose one project manager to receive this survey.

LBLaura Bennett
JOJamie Osei
CFChris Fielding

3 Contribute

Answer survey

Answers can't be edited once submitted

SupplierHargreaves Groundworks Ltd ProjectRiverside Quarter Phase 2
1. Did the supplier comply with all site health & safety requirements? Always Mostly Occasionally

4 Send

Surveys

Create and track supplier performance surveys.

FilterSort
ProjectTypeSuppliersPMsDateStatus
Bristol Harbourside HomesFor PMs 0102/09/2026 Sent View
Riverside Quarter Phase 2For Suppliers 2003/08/2026 Sent View
Manchester Victoria Depot360° 1231/07/2026 Draft Continue

5 Review

Bristol Harbourside Homes

For PMs · Sent 02/09/2026

Recipients
3
Responses
2
Completion
67%
Sent toFormSent dateStatus
Laura BennettProject Manager Communication & Responsiveness02/09/2026 Completed
Jamie OseiProject Manager Communication & Responsiveness02/09/2026 Completed
Owen PryceProject Manager Communication & Responsiveness02/09/2026 Outstanding
Create, prepare, contribute, send, review — the five moves the product had to connect.Recreated for this case study from the two prototypes; the figures are the prototypes' own sample data.
  1. 01Create — Set up what needs to be assessed
  2. 02Prepare — Choose suppliers and involve the right people
  3. 03Contribute — A focused way for Project Managers to give their input
  4. 04Send — Make the move from preparation to an active request explicit
  5. 05Review — Bring the information back into something the buyer can act on

What changed through the work

The project moved from a collection of requirements around assessments and surveys towards a clearer product model built around roles, ownership and states.

That gave the team a shared structure for new requirements. Instead of asking only where another field, button or screen should go, we could ask where it belonged in the workflow and who should be responsible for it.

The design became a way of defining the product, not just representing requirements that had already been defined.

Performance, back where the buyer can act on it

The end of the workflow is the part the customer actually bought: one project, the suppliers working on it, and how each of them is performing against the same set of measures.

Once For All Jane McDonald JM

Performance Management

Send survey
Overview Projects Suppliers Trades Tasks Surveys Templates Reports
Bristol Harbourside Homes Vistry Group · Bristol Download PDF Insights
Suppliers
2
Surveys
3
Trades
4
Average score All KPIs
75 /100 Average of all supplier survey scores for this project. 92Hargreaves Groundworks Ltd 58AquaFlow Mechanical
Performance breakdown Break down performance by suppliers, trades or templates. Group by
GroupAttitude to accepting faultsCo-operationCommunicationContractual ComplianceDesignWorkmanship QualityAverage
AquaFlow Mechanical 58585853635858
Hargreaves Groundworks Ltd 90959090909592
Project performance: one score, the suppliers behind it, and the same measures applied to each.Recreated for this case study from the Supply Chain Manager prototype.

What I'd carry forward

Performance Management reinforced something I've found increasingly important in enterprise products: complexity isn't always something you can remove. The roles, responsibilities and stages here were genuinely different, and making them behave the same would have produced a product that was simpler on paper and harder to use.

The better opportunity was deciding who needed to understand which part of the complexity, and when. On a similar project I'd establish the end-to-end role and state model earlier — as the scope expanded, that became the most useful way to evaluate new requirements and find gaps between parts of the experience.

It also changed how I think about 0→1 enterprise design. Sometimes the most useful work happens before there is a screen to polish: making responsibilities, states and product boundaries clear enough that the screens have a coherent system to belong to.