Designing Performance Management Across Multiple Roles
How I helped turn a loosely defined performance-management idea into a connected workflow for creating assessments, involving project teams and reviewing supplier performance.
Role
Senior Product Designer
Company
Once For All
Platform
Desktop web
Team
Product · Design · Engineering
Supply Chain Manager — Performance Management
Performance Management
Send survey30 2Jul
31 1Aug
01 1Aug
02 1Aug
03 1Aug
04 1Aug
05 1Aug
06 1Aug
07 1Aug
08 1Aug
09 1Aug
10 1Aug
11 1Aug
12
5 most recently sent
| Task | Assigned to | Project/Supplier | Due date | Status | |
|---|---|---|---|---|---|
| Collect 360° feedback — Cardiff | Chris Fielding | Cardiff Central InterchangeAquaFlow Mechanical | 06/08/2026 | Completed | View |
| Track Pennine quality improvement | Jamie Osei | Edinburgh Waterfront Res.Pennine Roofing & Cladding | 08/09/2026 | In progress | View |
| Submit updated method statement | Owen Pryce | Birmingham SmithfieldCityVolt Electrical | 01/09/2026 | Not started | View |
Project Manager — the surveys assigned to them
Surveys
Create and track supplier performance surveys.
| Project | Supplier | Form | Sent | Status | |
|---|---|---|---|---|---|
| Riverside Quarter Phase 2 | Hargreaves Groundworks Ltd | Site Performance & Safety | 03/08/2026 | Outstanding | Answer |
| Manchester Victoria Depot | Pennine Roofing & Cladding | Sustainability Practices | 13/07/2026 | Completed | View |
| St Thomas Hospital Wing B | AquaFlow Mechanical | Quality of Workmanship | 16/07/2026 | Completed | View |
Project Manager — answering one of them
Overview
Performance Management was being introduced into a platform already used by construction companies to manage their supply chains and compliance. The idea sounded straightforward: allow customers to assess how their suppliers were performing.
In practice, it touched several parts of the product and several different people. A Supply Chain Manager might set up an assessment, a Project Manager could contribute knowledge about a supplier, and the resulting information needed to come back in a form that could be understood and acted on.
The challenge wasn't simply designing a survey. It was defining how those responsibilities connected into one understandable workflow — and what each person needed to see and do at each stage.
-
Set up
Decide what is being assessed, and on which project.
Supply Chain Manager -
Prepare
Choose the suppliers and the people who need to take part.
Supply Chain Manager -
Contribute
Answer for the project and supplier you actually work with.
Project Manager -
Send
Turn preparation into an active request that leaves your workspace.
Supply Chain Manager -
Review
Read the responses back as supplier and project performance.
Supply Chain Manager
Starting with a product that was still being defined
When I joined the work, many of the individual requirements existed, but the end-to-end experience was still taking shape. Questions remained around who should create an assessment, who needed to contribute, when work was ready to be sent, and what happened once responses started coming back.
Rather than treating those as separate screen requirements, I started looking at Performance Management as a system. The questions became less about UI components and more about ownership:
- Who starts the process?
- Who contributes?
- What belongs to each role?
- When does responsibility move between people?
- How does someone understand what needs to happen next?
That became the structure I used to evaluate the designs as the product evolved.
Supply Chain Manager
Creates, configures and oversees. Decides what is assessed, who is involved and when it goes out.
Project Manager
Contributes project-specific knowledge about a supplier they work with directly.
Assessment
Collects structured performance input. Owned by one person, answered by another.
Results
Returns the information to the buyer as supplier, project and trade performance.
Designing around roles, not screens
One of the early risks was creating one workflow and adapting it slightly for everyone. The people involved weren't doing the same job.
The Supply Chain Manager needed oversight — setting up assessments, choosing suppliers, managing progress and reviewing results. The Project Manager's value came from knowledge of individual projects and suppliers, not from managing Performance Management as a whole.
One workflow, but not one experience. Instead of trying to make both sides symmetrical, I designed each around the responsibility that person actually had.
Manage the process
- Creates and configures assessments
- Selects suppliers and projects
- Sends surveys
- Tracks progress
- Reviews performance
Complete the task
- Receives focused requests
- Contributes project-specific knowledge
- Completes assigned input
- Does not manage the wider system
Supply Chain Manager — eight areas to manage
Performance Management
Send survey| Project | Type | Suppliers | PMs | Date | Status | |
|---|---|---|---|---|---|---|
| Bristol Harbourside Homes | For PMs | 0 | 1 | 02/09/2026 | Draft | Continue |
| Riverside Quarter Phase 2 | For Suppliers | 2 | 0 | 03/08/2026 | Sent | View |
| Cardiff Central Interchange | 360° | 1 | 1 | 24/07/2026 | Sent | View |
Project Manager — two, and only what is theirs
Performance Management
| Project | Supplier | Form | Sent | Status | |
|---|---|---|---|---|---|
| Riverside Quarter Phase 2 | Hargreaves Groundworks Ltd | Site Performance & Safety | 03/08/2026 | Outstanding | Answer |
| Manchester Victoria Depot | Pennine Roofing & Cladding | Sustainability Practices | 13/07/2026 | Completed | View |
| St Thomas Hospital Wing B | AquaFlow Mechanical | Quality of Workmanship | 16/07/2026 | Completed | View |
Turning the workflow into clear states
As the product became more defined, much of the interaction design came down to states and transitions. An assessment could exist before it was ready to send; once it had been sent, the important actions changed again.
The interface therefore needed to answer three simple questions: Where am I? What still needs to happen? What can I do next?
I used those states to decide which actions should be available, rather than exposing every possible action at once — which is why saving an assessment and sending it became deliberately separate decisions.
The assessment
Owned by the Supply Chain Manager
Each recipient
A Project Manager or supplier contact
Saved — still mine to finish
| Project | Type | Date | Status | |
|---|---|---|---|---|
| Bristol Harbourside Homes | For PMs | 02/09/2026 | Draft | Continue |
Sent — now someone else's task
| Project | Type | Date | Status | |
|---|---|---|---|---|
| Bristol Harbourside Homes | For PMs | 02/09/2026 | Sent | View |
Sequencing the complexity
Creating an assessment required several decisions: what was being assessed, which suppliers were involved, who needed to contribute and what information to collect. One large form would have exposed all of that at once.
I structured setup as a guided process instead, separating the decisions into stages while keeping enough context for someone to know where they were.
The goal wasn't to pretend the workflow was simple. It was to reveal the complexity at the point it became relevant — which also drew clearer boundaries between required information, optional configuration and actions that could happen later.
Setting up one assessment — choose a step to see what each stage asks for, and what it deliberately leaves until later.
Everything downstream depends on who the assessment is for, so it is asked first and on its own.
- A survey for Project Managers needs a project and a person; it never asks for supplier contacts.
- Choosing 360° means both, which is why the number of steps is not fixed until this answer exists.
Selection and configuration are the same decision, revealed in order.
- Trades only appear on a supplier once that supplier is selected — configuration follows the choice rather than preceding it.
- Naming a contact at each supplier is a separate step, because it depends on this one.
What the assessment asks is a choice, not a build, unless someone needs it to be.
- Templates are summarised by name and question count; the questions expand in place for anyone who wants to check first.
- Creating a new template is available, but deliberately positioned below the existing ones.
2. Were progress reports submitted accurately and on schedule?
3. Did the supplier proactively flag risks or delays?
Review restates every decision in one place, because the next action hands the work to someone else.
- Project, recipients and template are shown as plain values, not as editable fields.
- The primary action changes name here: Continue becomes Send survey.
Four of the setup steps. How many there are depends on the first answer: a Project Manager survey runs Project → PM → Template → Review, while a supplier survey adds supplier selection and a named contact.Recreated for this case study from the Supply Chain Manager prototype.
Giving Project Managers a focused task
The Project Manager experience became an important test of whether the role model actually worked.
They needed enough context to understand why their input was required, which supplier and project it related to, and what they had to complete — not another Performance Management dashboard.
So I treated their experience as a focused task rather than a reduced version of the Supply Chain Manager product. Anything to do with wider administration stayed on the Supply Chain Manager side; this side concentrated on the information only they could provide.
The whole of the Project Manager's job, on one screen
Once answered — kept, but closed
Submitted 02/09/2026 · read-only
Meanwhile, on the Supply Chain Manager side
Everyone this survey was sent to, and whether they've responded.
| Sent to | Form | Status |
|---|---|---|
| Laura BennettProject Manager | Communication & Responsiveness | Completed |
| Owen PryceProject Manager | Communication & Responsiveness | Outstanding |
Designing the actions around intent
Some of the smallest interaction decisions became important because they represented different commitments in the workflow.
Saving a draft and sending a survey couldn't behave like interchangeable primary actions. Saving meant “I'm still working on this.” Sending meant “This is ready to leave my workspace and become someone else's task.”
That distinction affected button hierarchy, states, validation and what happened next — a small UI decision carrying a bigger product principle: actions should communicate the consequence they create.
1 Leaving mid-setup
Close this survey?
Save your work as a draft, continue editing, or discard your changes.
Three outcomes, ranked — Save leads.
2 Finishing setup
On every earlier step this button reads Continue.
Renamed only on the final step, where the commitment changes.
3 Submitting an answer
Submit this survey?
Once submitted, you won't be able to edit your answers. Make sure everything is correct before continuing.
The Project Manager's equivalent moment, naming the consequence.
-
Save
Nothing leaves my workspace. The assessment stays a Draft and I keep the only action on it.
-
Continue
A step is settled, not the assessment. Reversible by going Back.
-
Send survey
The assessment becomes Sent and appears as Outstanding work for someone else.
-
Submit survey
The strongest commitment in the workflow: answers become Completed and read-only.
Designing while the scope was moving
Performance Management wasn't designed from a finished specification. Requirements arrived as conversations with product and engineering progressed, and the boundary between the two experiences moved with them.
Instead of treating each new requirement as another screen to add, I returned to three questions: Who owns this? At what stage? What changes because of it? That surfaced gaps in the product definition before they became more UI.
The clearest example is the setup flow itself: it has no fixed length. Answering “who is this for?” is what decides whether there are four steps or five — a structural consequence of the role model rather than a screen someone specified.
Bringing it together
By the later stages of the project, the individual screens had become one connected model.
Seen individually, these are fairly ordinary product interactions. The harder design problem was making the movement between them feel like one process rather than a collection of features.
1 Create
2 Prepare
3 Contribute
Answers can't be edited once submitted
4 Send
Surveys
Create and track supplier performance surveys.
| Project | Type | Suppliers | PMs | Date | Status | |
|---|---|---|---|---|---|---|
| Bristol Harbourside Homes | For PMs | 0 | 1 | 02/09/2026 | Sent | View |
| Riverside Quarter Phase 2 | For Suppliers | 2 | 0 | 03/08/2026 | Sent | View |
| Manchester Victoria Depot | 360° | 1 | 2 | 31/07/2026 | Draft | Continue |
5 Review
Bristol Harbourside Homes
For PMs · Sent 02/09/2026
| Sent to | Form | Sent date | Status |
|---|---|---|---|
| Laura BennettProject Manager | Communication & Responsiveness | 02/09/2026 | Completed |
| Jamie OseiProject Manager | Communication & Responsiveness | 02/09/2026 | Completed |
| Owen PryceProject Manager | Communication & Responsiveness | 02/09/2026 | Outstanding |
- 01Create — Set up what needs to be assessed
- 02Prepare — Choose suppliers and involve the right people
- 03Contribute — A focused way for Project Managers to give their input
- 04Send — Make the move from preparation to an active request explicit
- 05Review — Bring the information back into something the buyer can act on
What changed through the work
The project moved from a collection of requirements around assessments and surveys towards a clearer product model built around roles, ownership and states.
That gave the team a shared structure for new requirements. Instead of asking only where another field, button or screen should go, we could ask where it belonged in the workflow and who should be responsible for it.
The design became a way of defining the product, not just representing requirements that had already been defined.
Performance, back where the buyer can act on it
The end of the workflow is the part the customer actually bought: one project, the suppliers working on it, and how each of them is performing against the same set of measures.
Performance Management
Send survey| Group | Attitude to accepting faults | Co-operation | Communication | Contractual Compliance | Design | Workmanship Quality | Average |
|---|---|---|---|---|---|---|---|
| AquaFlow Mechanical | 58 | 58 | 58 | 53 | 63 | 58 | 58 |
| Hargreaves Groundworks Ltd | 90 | 95 | 90 | 90 | 90 | 95 | 92 |
What I'd carry forward
Performance Management reinforced something I've found increasingly important in enterprise products: complexity isn't always something you can remove. The roles, responsibilities and stages here were genuinely different, and making them behave the same would have produced a product that was simpler on paper and harder to use.
The better opportunity was deciding who needed to understand which part of the complexity, and when. On a similar project I'd establish the end-to-end role and state model earlier — as the scope expanded, that became the most useful way to evaluate new requirements and find gaps between parts of the experience.
It also changed how I think about 0→1 enterprise design. Sometimes the most useful work happens before there is a screen to polish: making responsibilities, states and product boundaries clear enough that the screens have a coherent system to belong to.